Click any of the project names below to see more information on that project.
Project Name | Proponent | Registration Date |
---|---|---|
Kemptown Quarry Development, Colchester County | Chapman Bros Construction Ltd | April 3, 2025 |
Mount Uniacke Quarry Expansion | Northumberland Capital Corporation Inc | August 29, 2023 |
Touquoy Gold Project Site Modifications Addendum | Atlantic Mining NS Inc | January 9, 2023 |
Mill Transformation and Effluent Treatment Facility | Northern Pulp Nova Scotia Corporation | March 14, 2022 |
Fifteen Mile Stream Gold Project | Atlantic Mining NS Inc | March 16, 2021 |
Realignment of Marine Drive (Highway 316) Project | Pieridae Energy (Canada) Ltd | March 10, 2021 |
Beaver Dam Mine Project | Atlantic Gold Corporation | June 28, 2017 |
Project Name | Proponent | Decision Date |
---|---|---|
Seabrook Quarry Expansion Project, Digby County | Nova Construction Co Ltd | May 7, 2025 |
EverWind Strait Crossing Transmission Line Project | EverWind NS Holdings Ltd | April 25, 2025 |
McCallum Settlement Quarry Expansion, Colchester County | Will-Kare Paving & Contracting Ltd | March 20, 2025 |
New Annan Quarry Expansion Project | Municipal Enterprises Ltd | March 6, 2025 |
Melvin Lake Wind Project | Melvin Lake Wind Inc | January 24, 2025 |
Rhodena Wind Project, Inverness County | ABO Energy Canada Ltd | January 6, 2025 |
GFL Environmental Services Inc | December 18, 2024 | |
Antrim Gypsum Project, Halifax County | CertainTeed Canada, Inc | October 25, 2024 |
Clydesdale Ridge Wind Project | Clydesdale Holdings Ltd | September 26, 2024 |
Gold Bond Gypsum Mine Expansion Project | Gold Bond Canada, Ltd | September 6, 2024 |
Pit No. 4 Extension Project | OSCO Aggregates Ltd | July 26, 2024 |
Windy Ridge Wind Power Project | Windy Ridge Wind (4560536 Nova Scotia Ltd) | July 25, 2024 |
Hartville Quarry Expansion Project | Alva Construction Ltd | July 3, 2024 |
Six Mile Brook Pit Expansion and Reclamation of Historic Workings Project | SW Weeks Construction Ltd | June 3, 2024 |
Temporary Material Staging Facility Project | Irving Shipbuilding Inc | March 20, 2024 |
Colpton Quarry Expansion Project | Dexter Construction Company Ltd | March 14, 2024 |
Kmtnuk Wind Power Project | Kmtnuk Wind Ltd | December 21, 2023 |
NS-NB Reliability Intertie Project | Nova Scotia Power Inc | December 15, 2023 |
Walden Quarry Expansion Project | Municipal Enterprises Ltd | December 14, 2023 |
Bear Lake Wind Power Project | Bear Lake Wind Ltd | December 13, 2023 |
Middle River Pit Expansion Project, Victoria County | Municipal Enterprises Ltd | August 17, 2023 |
Weavers Mountain Wind Energy Project | WEB Weavers Mountain Wind Ltd Partnership | July 27, 2023 |
Blair Road Pit Expansion Project | The Shaw Group Ltd | July 14, 2023 |
Ellershouse 3 Wind Project | Ellershouse 3 Wind Limited Partnership | July 5, 2023 |
Highway 101 Cambridge Interchange and Connector Road | Department of Public Works | June 28, 2023 |
Granite Village Quarry Expansion Project | Municipal Enterprises Ltd | May 11, 2023 |
Wedgeport Wind Farm Project | Wedgeport Wind Farm GP Inc, Elemental Energy Renewables Inc, Stevens Wind Ltd and Sipekne’katik First Nation, carrying on business as Wedgeport Wind Farm Limited Partnership | May 4, 2023 |
Higgins Mountain Wind Farm Project | Higgins Mountain Wind Farm Limited Partnership | May 4, 2023 |
Bear Head Energy Green Hydrogen and Ammonia Production, Storage and Loading Facility | Bear Head Energy Inc | April 12, 2023 |
Mersey River Wind Farm | Mersey River Wind Inc | March 27, 2023 |
Goose Harbour Lake Wind Farm Project | PHP Wind GP Inc and PHP Wind LP Inc, carrying on business as Port Hawkesbury Paper Wind Ltd Partnership | March 20, 2023 |
Westchester Wind Project | Natural Forces Developments LP | February 13, 2023 |
Benjamins Mill Wind Project | Natural Forces Developments Limited Partnership | February 13, 2023 |
Westchester Quarry Expansion | Chapman Bros Construction Ltd | February 13, 2023 |
EverWind Point Tupper Green Hydrogen/Ammonia Project – Phase 1 | EverWind Fuels Company | February 7, 2023 |
Waste Oil Recycling and Water Treatment Facility Project | Envirosoil Limited | January 27, 2023 |
Tote Road Quarry Expansion | Scotian Materials Ltd | January 16, 2023 |
Lantz Quarry Expansion Project | 2514869 Nova Scotia Limited, an affiliated company of Dexter Construction Company Limited | December 22, 2022 |
Sporting Mountain Quarry Expansion | Nova Construction Co Ltd | October 21, 2022 |
Goldboro Gold Project | Signal Gold Inc | June 10, 2022 |
Welshtown Quarry Expansion Project | Dexter Construction Company Limited | March 17, 2022 |
Highway 102 Aerotech Connector Road Project | Nova Scotia Department of Transportation and Infrastructure Renewal | September 10 |
Chapman Brothers Westchester Quarry Expansion Project | Chapman Bros Construction Ltd. | January 18, 2022 |
Whycocomagh Quarry Expansion Project | Dexter Construction Company Ltd. | December 23, 2021 |
Replacement Effluent Treatment Facility Project | Northern Pulp Nova Scotia Corporation | Withdrawn |
Highway 102 Aerotech Connector Road Project | Nova Scotia Department of Transportation and Infrastructure Renewal | January 5, 2021 |
Sporting Mountain Quarry Expansion Project | Nova Construction Co. Ltd. | August 25, 2020 |
Liquid Asphalt Storage Facility Project | General Liquids Canada, the Municipal Group of Companies | June 22, 2020 |
Spicer North Mountain Quarry Expansion Project | B. Spicer Construction Ltd. | April 28, 2020 |
Gabarus Quarry Expansion Project | Dexter Construction Company Limited | April 22, 2020 |
Gillis Lake Quarry Expansion Project | Zutphen Resources Inc. | February 28, 2019 |
Waste Dangerous and Non-Dangerous Goods Temporary Storage Facility | Envirosystems Incorporated | February 11, 2020 |
Sheet Harbour Aggregate Quarry Project | Dexter Construction Company Limited | November 8, 2019 |
Goffs Quarry Expansion Project | Scotian Materials Limited | October 25, 2019 |
Birrette’s East Uniacke Quarry Expansion Project | Bio Design Earth Products Inc. | September 13, 2019 |
Asbestos Waste Disposal Cell Project | Colchester Containers Limited | July 05, 2019 |
Canso Spaceport Facility Project | Maritime Launch Services Limited | June 4, 2019 |
MacLellans Mountain Quarry Expansion Project | S.W. Weeks Construction Ltd. | May 17, 2019 |
Highway 104 Twinning Sutherlands River to Antigonish Project | Nova Scotia Department of Transportation and Infrastructure Renewal | January 29, 2019 |
Asbestos Disposal Facility | Yarmouth County Solid Waste Management Authority | November 29, 2018 |
Goldboro Gold Project | Anaconda Mining Inc. | September 19, 2018 |
Pyrolysis Plant Project | Sustane Chester Incorporated | August 23, 2018 |
Highway 107 Burnside to Bedford Project | Nova Scotia Department of Transportation and Infrastructure Renewal | June 18, 2018 |
Money Point Quarry Expansion Project | Dexter Construction Company Limited | April 6, 2018 |
Williamsdale Quarry Expansion Project | Dexter Construction Company Limited | November 30, 2017 |
Glenholme Pit No. 4 Aggregate Extraction Project | OSCO Aggregates Limited | August 24, 2017 |
Rhodena Quarry Expansion Project | Zutphen Resources Inc. | August 3, 2017 |
Asbestos Waste Disposal Facility Project | Arlington Heights C&D Limited | July 24, 2017 |
Lower Carbon Fuel: Tire Derived Fuel (TDF) System | Lafarge Canada Inc. | July 6, 2017 |
Highway 101 Twinning Three Mile Plains to Falmouth Project | Nova Scotia Department of Transportation and Infrastructure Renewal | May 8, 2017 |
Highway 101 Digby to Marshalltown Corridor Project | Nova Scotia Department of Transportation and Infrastructure Renewal | March 22, 2017 |
Lake Major Dam Replacement Project | Halifax Water | February 9, 2017 |
Ellershouse Wind Farm Expansion Project | Alternative Resource Energy Authority | February 2, 2017 |
Bear Paw Pipeline Project | Bear Paw Pipeline Corporation Inc | December 22, 2016 |
Loch Katrine Quarry Expansion Project | Dexter Construction Company Limited | December 22, 2016 |
Envirosoil Facility – Addition of Stabilization & Solidification Technology (2016) Project | Envirosoil Limited | December 22, 2016 |
New Victoria Community Wind Power Project | Celtic Current Limited Partnership | September 20, 2016 |
Auld’s Cove Transmission Project | Nova Scotia Power Inc. | April 29, 2016 |
Black Point Quarry Project | Black Point Aggregates Inc. | April 26, 2016 |
Seabrook Quarry Expansion (2016) Project | Municipal Enterprises Limited | April 20, 2016 |
The Envirosystems Facility: Modification to Temporarily Store and Clean Low-Level NORM Waste and Equipment, and Treat Wash-Water Project | Envirosystems Inc. | April 14, 2016 |
Hardwood Lands Community Wind Project | Scotian WindFields Inc., Scotian Wind Inc., SWEB Development Inc. and WEB Wind Energy North America Inc. | February 9, 2016 |
Liverpool Wind Farm Project | Liverpool Wind Energy Storage Project Inc. | October 28, 2015 |
Envirosoil Facility – Addition of Stabilization and Solidification Technology Project | Envirosoil Limited | September 28, 2015 |
Nictaux Quarry Expansion Project | Dexter Construction Company Limited | June 19, 2015 |
Harrietsfield Williamswood Wind Farm Project | Watts Wind 4 Limited Partnership | May 26, 2015 |
Bear Head LNG Project | Bear Head LNG Corporation | May 15, 2015 |
National Gypsum Mine Extension Project | National Gypsum (Canada) Limited | April 9, 2015 |
Brierly Brook Quarry | Nova Construction Co. Ltd | March 12, 2015 |
Irish Cove Quarry Expansion Project | Municipal Enterprises Limited | February 26, 2015 |
Amherst Community Wind Farm Project | Mi’kmaq Wind4All Communities L.P. | Febrary 17, 2015 |
Porters Lake Wind Farm Project | Watts Wind Energy Inc. | January 30, 2015 |
Chebucto Terence Bay Wind Farm Project | Chebucto Terence Bay Wind Farm Limited | December 11, 2014 |
Coldbrook Sand Pit Expansion Project | 3048483 Nova Scotia Limited | December 4, 2014 |
Kemptown Wind Project | Affinity Wind Limited Partnership | December 3, 2014 |
Chedabucto Aggregates Quarry Expansion | Chedabucto Aggregates Limited | November 6, 2014 |
Barrachois Wind Farm | Natural Forces Wind Inc. | July 12, 2014 |
James River Quarry Expansion Project | Municipal Enterprises Limited | June 4, 2014 |
Goldboro LNG Project | Pieridae Energy (Canada) Limited | March 21, 2014 |
Bateston Community Wind Power Project | Celtic Current Limited Partnership | February 27, 2014 |
Ellershouse Wind Project | Alternative Resource Energy Authority | February 17, 2014 |
Kemptown Wind Farm | Affinity Renewables LP | February 10, 2014 |
Mulgrave Community Wind Power Project | Celtic Current LP | February 10, 2014 |
Limerock Wind Project | Affinity Wind LP | February 4, 2014 |
Greenfield Wind Farm | Affinity Wind Limited Partnership | January 28, 2014 |
North Beaver Bank Community Wind Project | Scotian WindFields Inc., Scotian Wind Inc., and WEB Wind Energy North America Inc. | January 6, 2014 |
Aulds Mountain Wind Farm | Natural Forces Wind Inc. | December 16, 2013 |
Lafarge Hardscratch Quarry Extension Project | Lafarge Canada Inc. | December 11, 2013 |
Nine Mile River Community Wind Project | Scotian WindFields Inc., Scotian Wind Inc., and WEB Wind Energy North America Inc. | December 9, 2013 |
Gaetz Brook Wind Farm | Natural Forces Wind Inc. | November 15, 2013 |
Mink Oil Production Plant | Spec Environmental Solutions Incorporated | November 14, 2013 |
Chebucto-Pockwock Community Wind Project | Pockwock Wind Limited Partnership | October 31, 2013 |
Pictou County Natural Gas Pipeline | Heritage Gas Limited | August 26, 2013 |
Martock Ridge Community Wind Project | Scotian WindFields Inc., Scotian Wind Inc., and WEB Wind Energy North America Inc. | July 24, 2013 |
Donkin Export Coking Coal Project | Xstrata Coal Donkin Management Limited | July 19, 2013 |
Millbrook Community Wind Project | Truro-Millbrook Wind Limited Partnership | July 2, 2013 |
Truro Heights Community Wind Project | Truro Heights Wind Limited Partnership | July 2, 2013 |
Whynotts Community Wind Project | Whynotts Wind Limited Partnership | July 2, 2013 |
McLellans Brook Wind Energy Project | Watts Wind Energy Inc. | June 25, 2013 |
Maritime Link | NSP Maritime Link Inc. | June 17, 2013 |
Hillside Boularderie Wind Farm | Natural Forces Wind Inc. | June 20, 2013 |
Middlewood Quarry Expansion | Dexter Construction Company Limited | June 6, 2013 |
Alton Natural Gas Pipeline | Alton Natural Gas Storage LP | May 31, 2013 |
Asbestos Waste Management Site | Marinus Verhagen Enterprises Limited | April 22, 2013 |
Barrington Wind Energy Project | Watts Wind Energy Inc. | April 3, 2013 |
Sable Wind Project | Municipality of the District of Guysborough in partnership with Nova Scotia Power Inc. | March 15, 2013 |
Cooks Brook Sand and Gravel Pit Extension | Gallant Aggregates Limited | January 7, 2013 |
Torbrook Disposal of Waste Dangerous Goods Facility (Asbestos) | Nova Scotia Limited | November 29, 2012 |
Kaizer Meadow Wind Project | Municipality of the District of Chester | September 27, 2012 |
Retirement Care Facility Expansion, Middleton | GEM Health Care Group | September 6, 2012 |
Clydesdale Ridge Wind Farm | Clydesdale Ridge Wind LP | July 24, 2012 |
Provincial Energy Ventures Wharf Approach Deepening Project | Provincial Energy Ventures (PEV) | July 24, 2012 |
South Canoe Wind Power Project | Oxford Frozen Foods, Minas Basin Pulp and Power and Nova Scotia Power Incorporated | July 13, 2012 |
Torbrook Gravel Pit Expansion | Ivan H. Trimper Excavating Ltd. | April 20, 2012 |
Pugwash Wind Farm | North Cumberland Wind Farm LP | March 27, 2012 |
Glen Dhu South Wind Power Project | Shear Wind Inc. | March 16, 2012 |
Northumberland Rock Quarry Extension Project | Alva Construction Limited | January 9, 2012 |
Warehouse & Distribution Centre Expansion | Home Hardware Stores Limited | Oct 20, 2011 |
ScoZinc Operations Southwest Expansion | ScoZinc Limited | October 07, 2011 |
Fairmont Wind Farm | Wind Prospect Inc. | September 08, 2011 |
Asbestos Transfer / Bulking Facility | Guild Contracting Specialties (2005) Inc. | March 02, 2011 |
Hampton Mountain Wind Power Project | SP Development Limited Partnership | January 10, 2011 |
Asbestos Transfer Bulking Facility | Burnside Environmental Services Ltd. | December 10, 2010 |
Yarmouth County Petroleum Contaminated Soil Remediation Facility | Yarmouth County Solid Waste Park Management Authority | November 10, 2010 |
Hants County Aggregate Quarry Extension Project | Municipal Enterprises Ltd. | August 12, 2010 |
Duncan Gillis Quarry Extension Project | Gillis Construction Cape Breton Limited | September 14, 2010 |
Hardscratch Quarry Extension Project | Aberdeen Paving Limited | Aug 25, 2010 |
Liquid Asphalt Storage Facility | General Liquids Canada Ltd. | Apr 08, 2010 |
Whycocomagh Quarry Extension Project | Alva Construction Limited | May 06, 2010 |
Proposed Highway 113 | Nova Scotia Department of Transportation and Public Works | Apr 09, 2010 |
Martin Marietta Quarry Fines Storage Development Project | Martin Marietta Ltd. | Apr 01, 2010 |
Waste Dangerous Goods Handling Facility Relocation | Refrigerant Services Inc. | Mar 12, 2010 |
Wind / Hydro Energy Project | Cape Breton Explorations Limited. | Mar 01, 2010 |
Miller's Creek Gypsum Mine Extension | CGC Inc. Fundy Gypsum | Feb 4, 2010 |
Expansion of Debert Industrial Waste Management Facility | Atlantic Industrial Services | September 25, 2009 |
Fundy Tidal Energy Demonstration Project | Fundy Ocean Research Centre for Energy | September 15, 2009 |
Digby Wind Power Project | SkyPower Corp. and Scotian Windfields Inc. | August 24, 2009 |
Maryvale Wind Project | Maryvale Wind LP | August 11, 2009 |
Tufts Cove 6 Waste Heat Recovery Project | Nova Scotia Power Incorporated (NSPI) | May 04, 2009 |
Sydney Harbour Access Channel Deepening and Sydport Container Terminal | Laurentian Energy Corporation | April 28, 2009 |
Asbestos Transfer/Bulking Facility | Enviroclean Ltd./Power Vac Servics | Jan 20, 2009 |
Glen Dhu Wind Farm | Shear Wind Inc. | Feb 02, 2009 |
Donkin Underground Exploration Project | Xstrata Coal | Dec 18, 2008 |
Proposed Melford International Terminal | Melford International Terminal Inc. | Oct 23, 2008 |
Point Tupper Wind Farm | Renewable Energy Services Limited | Oct 17, 2008 |
Dalhousie Mountain Wind Farms | RMSenergy Ltd. | Sep 02, 2008 |
Modification of Biomedical and International Waste Treatment Facility | Stericycle, Inc. (Medical Waste Management Inc.) | Aug 08, 2008 |
Nuttby Mountain Wind Farm | 3217284 Nova Scotia Limited | Jul 14, 2008 |
Amherst Wind Energy Project | Amherst Wind Power LP | May 26, 2008 |
Panuke Road Quarry Expansion | Municipal Enterprises Limited | Apr 07, 2008 |
Surface Gold Mine at Moose River Gold Mines, Halifax County | DDV Gold Limited | Feg 1, 2008 |
Alton Underground Natural Gas Storage Facility | Alton Natural Gas Storage LP | Dec 18, 2007 |
Whites Point Quarry | Bilcon of Nova Scotia Corporation | Nov 20, 2007 |
MacLeod's Settlement Pit Development | 2227754 Nova Scotia Limited | Sep 14, 2007 |
Lovett Road Aggregate Pit Expansion | Shaw Resources | Aug 20, 2007 |
Glenholme Gravel Pit Expansion | M.S.D. Enterprises Limited |
Aug 3, 2007 |
Elmsdale Quarry Expansion, Hants County | Gallant Aggregates Limited | Jul 24, 2007 |
Keltic Petrochemical | Keltic Petrochemical Inc. | Mar 14, 2007 |
Remediation of the Sydney Tar Ponds and Coke Ovens Sites | Sydney Tar Ponds Agency | Jan 23, 2007 |
Research & Development and Soil Treatment Facility | CleanEarth Technologies Incorporated | Oct 03, 2006 |
Higgins 3.5 MW Wind Power Project | Springhill Riverhurst Wind Power Ltd. | Sep 27, 2006 |
Lingan 10 MW Wind Power Project | Glace Bay Lingan Wind Power Ltd. | Aug 03, 2006 |
Marshall Road Sand Pit Expansion | Scotia Aggregates Ltd. | May 30, 2006 |
Canso Wind Farm | Barrington Wind Energy Ltd. | May 19, 2006 |
Leitches Creek Quarry Expansion | Alva Construction Ltd. | Apr 28, 2006 |
Rhodena Rock Quarry Expansion | Rhodena Rock Ltd. | Apr 18, 2006 |
Surface Coal Mine and Reclamation Project - Prince Mine Site | Pioneer Coal Ltd. | Dec 28, 2005 |
Russell Lake West Wetland Alteration | Clayton Developments Ltd. | Dec 16, 2005 |
Lingan 4 MW Wind Power Project | Cape Breton Power Ltd. | Nov 15, 2005 |
Wind Energy Project, Creignish Rear Site | Black River Wind Ltd. | Nov 14, 2005 |
Nictaux Pit and Quarry | Ward Aggregates Ltd. | Oct 28, 2005 |
Spar Road Wal-Mart Development | Wal-Mart Canada Corporation | Sep 26, 2005 |
MWM Biomedical Waste Treatment Facility | Medical Waste Management Inc. | Sep 02, 2005 |
Sovereign Resources Quarry Expansion | Sovereign Resources Inc. | Aug 29, 2005 |
Highway 104 at Antigonish | Nova Scotia Department of Transportation and Public Works | Aug 29, 2005 |
Yarmouth Wal-Mart Development | Plaza BNG Inc. | Feb 1, 2005 |
Point Aconi Phase 3 Surface Coal Mine | Thomas Brogan and Sons Construction Ltd. | Jan 4, 2005 |
Amherst High Pressure Steel Distribution Pipeline | Heritage Gas | Dec 29, 2004 |
Kemptown Road Quarry Expansion Project | Dexter Construction Co. Ltd. | Dec 29, 2004 |
Bond Road Sand Pit Operations | Twin Mountain Construction Limited | Dec 20, 2004 |
Bulk Tank Farm, Blending, Packaging and Storage Facility | Alpha Chemical Ltd. | Dec 14, 2004 |
Battery Storage Facility at Chain Lake Drive | John Ross and Sons Limited | Nov 18, 2004 |
Bear Head Liquefied Natural Gas Terminal | Access Northeast Energy Inc. | Aug 9, 2004 |
Used Battery Storage Facility | Maritime Metal Inc. | Aug 6, 2004 |
East Uniacke Quarry Expansion | S. W. Weeks Construction Ltd. | Jun 21, 2004 |
Combustion Turbine Project | Nova Scotia Power Incorporated (NSPI) | May 3, 2004 |
Grinding Plant | Q’Max Solutions Inc. | Mar 26, 2004 |
Battery Storage Facility | Maritime Battery Ltd. | Feb 13, 2004 |
Stellarton Surface Coal Mine Extension | Pioneer Coal Limited | Feb 3, 2004 |
Marine Terminal at Point Tupper | Nova Scotia Power Incorporated (NSPI) | Feb 3, 2004 |
Waste Dangerous Goods Drum Storage Facility | Quantex Technologies Inc. | Dec 2, 2003 |
Pubnico Point Wind Farm | Pubnico Point Wind Farm Inc. | Nov 7, 2003 |
Cambridge Aggregate Pit Expansion | Lawson Bennett Trucking Ltd. | Sep 19, 2003 |
Remediation of Soils Containing Dry Cleaning Fluids (and Related Products) | Envirosoil Limited | Jun 6, 2003 |
Dangerous Goods Bulk Storage and Handling Facility | Alpha Chemical Ltd. | Apr 11, 2003 |
Troy Quarry Expansion | S. W. Weeks Construction Limited | Mar 7, 2003 |
Tufts Cove #4 | Nova Scotia Power Incorporated | Dec 10, 2002 |
White Rock Quartz Mine | Black Bull Resources Incorporated | Sep 6, 2002 |
Kennedys Big Brook Red Marble Mine | MacLeod Resources Ltd. | Sep 3, 2002 |
Short-term Abestos Storage Area | Burnside Environmental Services Ltd. | Mar 7, 2002 |
Glycol Concentration Facility | Inland Technologies Canada Inc | Mar 1, 2002 |
White Rock Quartz, Kaolin and Mica Mine | Black Bull Resources Incorporated | Feb 18, 2002 |
Troy Quarry Expansion | S.W. Weeks Construction Limited | Dec 21, 2001 |
Highway 101 Extension - Digby to Weymouth North | Nova Scotia Department of Transportation and Public Works | Nov 29, 2000 |
Nova Scotia Gas Distribution Project | Sempra Atlantic Gas | Jun 13, 2000 |
Beaver Bank Bypass | Nova Scotia Department of Transportation and Public Works | Mar 16, 2000 |
Evironmental Assessments : Pre Year 2000 |